Management Review under ISO 9001: Inputs, KPIs and a Sample Report
Digital Airways·

The management review under ISO 9001 is the evaluation of the quality management system by top management, meaning the executive board or the owner. Clause 9.3 requires it at planned intervals. Management uses defined inputs to check whether the system continues to be suitable, adequate and effective and aligned with the strategic direction. The result is documented decisions on improvements, on changes to the system and on resource needs. Most SMEs hold it once a year, often a few weeks before the surveillance or recertification audit.
In this article you will find the required content under clause 9.3, a list of suitable KPIs, a sample report you can adopt and the process in five steps. For the general changes in the new edition, see our article on ISO 9001:2026.
What clause 9.3 requires
Clause 9.3 has three parts. Summarised in our own words, the standard requires the following.
9.3.1 General. Top management reviews the QMS at planned intervals. It determines whether the system continues to be suitable, adequate and effective and aligned with the strategic direction of the organisation.
9.3.2 Inputs. The review considers at least these points.
- Status of actions from previous management reviews
- Changes in external and internal issues relevant to the QMS
- Information on the performance and effectiveness of the QMS, including trends in
- customer satisfaction and feedback from relevant interested parties
- the extent to which quality objectives have been met
- process performance and conformity of products and services
- nonconformities and corrective actions
- monitoring and measurement results
- audit results
- the performance of external providers
- Adequacy of resources
- Effectiveness of actions taken to address risks and opportunities
- Opportunities for improvement
9.3.3 Outputs. The review leads to decisions and actions on opportunities for improvement, any need for changes to the QMS and resource needs. The results are retained as documented information.
The standard does not prescribe a format. A meeting with minutes is just as acceptable as a report that management discusses and approves. What matters is that all inputs are covered and that they lead to decisions with owners and deadlines.
What changes with ISO 9001:2026
According to analyses by certification bodies, the 2026 edition separates risks and opportunities into their own subclauses. This carries through to the management review. The effectiveness of actions on risks and the effectiveness of actions on opportunities are considered separately, and the list of inputs is extended. Check the exact wording in the standard before you change your template. If you already structure the review by risks and opportunities separately, you are prepared for the transition.
Which KPIs work
The inputs become tangible when you assign one or two KPIs to each. Comparing with the previous year is essential. The standard explicitly speaks of trends, and a single figure without comparison says little.
| Input under 9.3.2 | Possible KPI | Source |
|---|---|---|
| Customer satisfaction | Average rating after a complaint is closed, complaints per 1,000 orders | Complaint management, customer surveys |
| Quality objectives | Share of objectives met, deviation per objective | Objective planning |
| Process performance | On-time delivery, lead time, scrap rate | Process KPIs, ERP |
| Nonconformities and corrective actions | Open actions, share of actions completed on time | Action list |
| Monitoring and measurement | Share of test equipment with valid calibration, out-of-tolerance results | Test equipment management |
| Audit results | Findings per audit, of which nonconformities, status of actions | Audit management |
| External providers | Average supplier rating, number of supplier complaints | Supplier management |
| Resources | Training rate, overdue trainings, bottlenecks | Training management, staff planning |
| Risks and opportunities | Number of high risks, share of actions implemented effectively | Risk management |
| Improvement | Improvement suggestions implemented | CIP, suggestion scheme |
Choose a few KPIs that you collect the same way every year rather than many that are defined differently each year. Only then can you compare trends over several years.
Sample report you can adopt
The following structure shows a report for a fictitious SME with around 60 employees. The figures are invented and only serve as an illustration. Adopt the structure and replace the values with your own.
Management review 2026, Example Ltd Period 1 January to 31 December 2026, participants managing director, head of production, head of sales, quality management.
- Actions from the last review. 7 of 9 actions completed. Still open are the introduction of digital test equipment management and training on the new edition of the standard, both with a new deadline.
- Changes in the context. New key account from the food industry with its own quality assurance agreement. Transition to ISO 9001:2026 by the recertification audit.
- Customer satisfaction. 38 complaints compared with 52 in the previous year. Average rating of complaint handling 4.3 out of 5.
- Quality objectives. 4 of 5 objectives met. On-time delivery of 95 percent was missed, 91 percent was achieved.
- Process performance. Scrap rate reduced from 2.1 to 1.6 percent. Lead time from quote to order unchanged.
- Nonconformities and corrective actions. 24 actions opened, 21 closed, 18 of them on time.
- Monitoring and measurement. 96 percent of test equipment with valid calibration, 3 out-of-tolerance results, all handled.
- Audit results. 4 internal audits, 11 findings, 2 of them nonconformities. External surveillance audit without nonconformities.
- External providers. 3 suppliers below the minimum rating, supplier meeting held with one of them.
- Resources. Training rate 88 percent. Bottleneck in quality inspection during the holiday season.
- Risks and opportunities. 2 high risks, both with actions. Opportunity in the food industry assessed with its own action towards IFS certification.
- Opportunities for improvement. On-time delivery through better capacity planning, a deputy in quality inspection.
Decisions
| Decision | Owner | Deadline |
|---|---|---|
| Introduce capacity planning in production, target on-time delivery 95 percent | Head of production | 31.03.2027 |
| Train a second person for quality inspection | Quality management | 30.04.2027 |
| Update templates and processes to ISO 9001:2026 | Quality management | 30.06.2027 |
| Quality policy confirmed unchanged | Managing director | done |
Overall assessment. The QMS is suitable, adequate and effective. It is aligned with the strategic direction, in particular the expansion in the food industry.
Signature managing director, date.
The process in five steps
- Set the date and period. Schedule the review so that actions can still be implemented before the next external audit. The completed financial year is usual.
- Collect the figures. Quality management gathers the KPIs for all inputs and compares them with the previous year.
- Prepare a pre-report. A short report with figures, notable points and proposals. Management receives it a few days before the meeting.
- Review and decide. In the meeting, management reviews each input and makes decisions with owners and deadlines.
- Document and follow up. Report and decisions are approved and filed. The actions go into the action list and are the first input of the next review.
Common mistakes
- Figures without decisions. A report that only lists KPIs does not meet clause 9.3.3. Auditors specifically ask about the decisions and their implementation.
- Management is not involved. The review is the task of top management. If quality management writes the report alone and only presents it for signature, the review by management is missing.
- Missing inputs. Often forgotten are the status of previous actions, the performance of external providers and the effectiveness of actions on risks and opportunities.
- New KPIs every year. Without consistent definitions you cannot show trends.
- Too late in the year. If the review takes place just before the audit, the auditor cannot see any implementation of the decisions.
Management review with QuKI
The biggest effort is usually collecting figures from different lists. In QuKI, our AI-native QM software, the management review pulls the KPIs together from all booked modules, from complaints and audits to suppliers and risks. You choose the period and file the report as a PDF.
Anything a standard statistic does not show, you ask the AI in your own words, for example how complaints from a particular customer have developed compared with the previous year. The analysis is based on the data of your tenant. You save a good question and repeat it every year with the current figures.
The inputs come straight from the modules, for example complaint management, audit management, supplier management, risk management and test equipment management.
Frequently asked questions about the management review
How often must a management review take place?
ISO 9001 requires planned intervals without specifying a frequency. Most companies hold it once a year. After major changes, such as an acquisition or a new site, an additional review is worthwhile.
Who must take part in the management review?
Top management is responsible. It makes sense to involve the heads of the main departments, because they can explain the figures and take on actions. Quality management usually prepares the review.
Does the management review have to be a meeting?
No. The standard does not prescribe a format. A meeting has the advantage that management discusses the figures together and assigns decisions directly.
What is the difference from the internal audit?
The internal audit checks whether the system meets the requirements and is effectively implemented. The management review is the overall evaluation by management. The results of internal audits are one of its inputs. Our article on the internal audit question checklist shows how to set up the internal audit.
How long must the management review be kept?
The standard does not specify a period. It is common to keep at least the reports since the last recertification, so that the auditor can follow trends and the implementation of earlier decisions.
Your next step
Would you like to see how the KPIs from complaints, audits, suppliers and risks flow into the management review automatically? In a QuKI demo we will show you in 30 minutes using your own processes. Or try QuKI free for 30 days.
The requirements of ISO 9001 are summarised in our own words in this article. The text of the standard is binding, available in Switzerland from SNV. Information on ISO 9001:2026 is based on publications by certification bodies and specialist publishers, as of November 2026. The sample report contains invented figures.
Want to see our articles more often in Google Search?
Add as a preferred source on Google